Five or more connections or a single connection over 60kVA

Five or more connections or a single connection over 60kVA

This form is for customers looking for a new supply to five or more property connections or single connection up to 300kVA. Required fields are indicated with an asterisk*

Please complete the form, following the below steps, which should take about 20 minutes to complete. Please ensure that you have all of below details available before starting the application, including the relevant 'Property location and layout plan' files ready to upload.

For additional help and support you can contact us on 0800 988 1730 or email: PACE@enwl.co.uk

 

If you have any feedback, please click on the green 'Feedback' tab on the middle-left of your screen and provide us with any feedback about your experience.  This will enable us to continue improving the application process. 

 

The data you provide will not be shared for sales or marketing purposes. Information you share with us will only be used by Electricity North West. We will contact you during emergency situations, such as a power cut or to inform you about planned works that may affect your supply. To continue improving the service we provide to our customers, from time to time we carry out customer surveys and you may be contacted to take part.

Privacy policy:  We are committed to protecting and respecting your privacy. Please read our Privacy Policy carefully to understand our views and practices regarding your personal data and how we will treat it.

Five or more connections or a single connection over 60kVA.jpg

Preferred method of communication: *

Is there an additional contact for this project (e.g. if you are not the site manager/representative or will have a builder to manage your on-site activities, including the final connection)?

Additional contact? *

Additional contact

Please provide details of the site manager, consultant or project manager who will be managing your on-site activities, including the final connection:

Are the site details the same as the applicant details?

Site details same as applicant? *

Site details

You can convert a post code to a grid reference and / or put a pin on a map indicating your supply position and realise your X & Y coordinates using websites such as http://www.gridreferencefinder.com/ or http://www.streetmap.co.uk/

Type of supply

Type of supply *
Which type of quotation would you like? *
  • A full Connection Offer is where we carry out a full network study and provide you with a firm quote that you can accept. Connection Offer Expenses now apply to all 33kV and 132kV Firm applications.
  • A budget estimate is where we provide you with a quick indicative price. With the option you will get a faster response compared to a firm quote, however we do not carry out a full and detailed network study and our budget quotes cannot be accepted as they are not firm offers.
  • A feasibility study is a bespoke study tailored to your specific needs. We will work with you to provide you with the information you need, however this is not a firm quotation. There will be a upfront charge for this option. The costs will be advised upon your application.
  • Details of our charges associated with the provision of quotations and estimates can be found in our Statement of Methodology and Charges for Connection to Electricity North West Limited's Electricity Distribution System.

 

We publish all of our timescales, including our Guaranteed Standards of Performance, however we always work to exceed these timescales.

Site plan

Please provide a site location plan (typically a scale of not less than 1:500), including the following:

  • Preferred point for the cable to enter the property (if appropriate)
  • Preferred Point of Connection
  • The existing/proposed meter point location marked with an X
  • Total load details, including load breakdown if required
  • X & Y Co-ordinates
  • Site boundaries with reference to adjacent footpaths and highways
  • Proposed meter and substation for load over 300kVA

Load details

Commercial load details

Domestic load details

Total load details

Will you be using any of the following to heat your property/ies?

Electric panel heaters

Off peak storage heaters

Air/ground source heat pumps

If you are installing Heat Pumps you will need to complete the relevant forms that can be found on ENA's website where you will need to complete one of the forms A, B or C, depending on the equipment you are installing www.energynetworks.org/electricity/futures/heat-pumps.html.

Installing any motors? *

Electric Motors

Electric Vehicle Chargers

* Please include the make, model and specification of all of the chargers in this application

Generation

Will generation equipment be installed?
Will this be used for generating electricity back in to the network?

If you ticked YES you will need to complete the relevant form depending on the size of geenration you are planning to connect. 

If you are installing Generation, please visit our generation pages to find the right form for you.

Existing supplies information

Existing supplies information - one meter

PLEASE NOTE: Your MPAN is a unique 13 digit number and can be found on your electricity supply bill. Your MPAN should begin with the number 16 if you are within our network area. If your MPAN does not begin with 16 then please contact your electricity supplier to confirm who is your network operator who can deal with your connection.

Existing supplies information - two meters

 

PLEASE NOTE: Your MPAN is a unique 13 digit number and can be found on your electricity supply bill. Your MPAN should begin with the number 16 if you are within our network area. If your MPAN does not begin with 16 then please contact your electricity supplier to confirm who is your network operator who can deal with your connection.

Existing supplies information - 3 meters

 

PLEASE NOTE: Your MPAN is a unique 13 digit number and can be found on your electricity supply bill. Your MPAN should begin with the number 16 if you are within our network area. If your MPAN does not begin with 16 then please contact your electricity supplier to confirm who is your network operator who can deal with your connection.

Existing supplies information - 4 meters

 

PLEASE NOTE: Your MPAN is a unique 13 digit number and can be found on your electricity supply bill. Your MPAN should begin with the number 16 if you are within our network area. If your MPAN does not begin with 16 then please contact your electricity supplier to confirm who is your network operator who can deal with your connection.

Existing supplies information - 5 meters

PLEASE NOTE: Your MPAN is a unique 13 digit number and can be found on your electricity supply bill. Your MPAN should begin with the number 16 if you are within our network area. If your MPAN does not begin with 16 then please contact your electricity supplier to confirm who is your network operator who can deal with your connection.