D4 Architecture build lessons learnt report
Architecture build lessons learnt report
Deliverable 4 explains the project progress to date with a specific focus on the methods to implement, build and test the designed solution into a functional prototype.
The associated documents are:
- “BiTraDER Platform Development Report” which provides a summary of the BiTraDER platform’s build phase and gives an overview of the components that were built or configured for the simulation trials.
- “BiTraDER Test Plan” which shows the development of the ENWL ANM system to enable integration with the BiTraDER trading platform to test and carry out simulated constraint scenarios for the simulation trials.
The trading platform build was led by project partner Electron. The test plan and development of the ENWL ANM system was led by the ENWL IT team. Both teams worked closely together throughout the process to enable integration of the two systems.
Architecture build lessons learnt report
Fourth project deliverable
Associated documents
All documents associated with the fourth deliverable