ENWL027 – Enhanced LFDD
ENWL027 – Enhanced LFDD
Enhanced Low Frequency Demand Disconnection (LFDD) aims to develop an intelligent way to shed load in the case of low frequency at the Primary Supply Point using SuperTAPP relays deployed during the CLASS rollout.
Timescales: June 2021 – January 2023.